The KONE lift installation process

Checklist

Before we start building

Lift shaft condition

The shaft should be clean, dry, and free of debris.

Entrance protection

All entrances to the shaft are protected by full-height protection (supplied by KONE) to prevent personnel from falling in.

Lifting points

Hoisting beams, lifting eyes, and ventilation ducts must be in place, as specified in the building plans to avoid costly delays to the building process.

Power supply

A 3-phase power supply for the installation hoist and the lift must be installed.

Material storage

A clean, dry 50 m2 storage space must be provided on the ground floor of the building, close to the shaft and with clear access.

The KONE lift installation process

img_ shutterstock_1386717164_edit_Planner_v2_RGB_highlight_teaser

Building information modeling (BIM)

Long before we arrive on site we use digital planning techniques like BIM to prepare for the installation process. This includes creating 3D digital models of lifts and escalators that contain information on things like building interface points, the forces applied to the building by KONE equipment, and even information about the materials we use. BIM also helps to make collaboration and communication easier between all parties during the project.

The KONE lift installation process

Two men in hi-vis jackets have a conversation on a building site while looking at a tablet.

Professional project management

When you buy a solution from KONE, you’re getting far more than just equipment and installation. Every single project we handle is led by a dedicated, accredited project manager with solid experience of running similar projects.

Using our Installation Management Tool for mobile devices, anyone in your team who needs to can keep track of the installation process in real time and even communicate directly with the KONE project manager.

The KONE lift installation process

shutterstock_140317378_edit_RGB:535x365

Efficient installation

When it comes to installing your equipment, our goal is to keep everything tidy and efficient so that all personnel get their work done safely and on schedule. The KONE lift installation process doesn’t require scaffolding, which cuts costs and minimizes disruption to other construction work on site.

The KONE lift installation process

KONE_construction_site_Nexans_Norway-17:535x365

Safety is our number one priority

All our installation technicians receive regular safety training and undergo safety audits to review their working practices. Our installation process is also eco-efficient – we take care that all waste materials are properly sorted and recycled, and minimize the use of harmful substances like solvents.

Get in touch

You can use the form below to tell us more about how we can help you. One of our team will be in touch as soon as possible.


Country *|Great Britain|Northern Ireland|Republic of Ireland





+44

+353







My query is about *|Installing new equipment in a new building|Installing new equipment in an existing building|Repairing or upgrading existing equipment|Maintenance|24/7 Connected Services|Other
Equipment/service type *|Elevators|Autowalks|Escalators|Doors|Advanced People Flow solutions|People Flow planning|Loading Bay|Other
Equipment/service type *|Elevator|Autowalks|Escalators|Advanced People Flow solutions |People Flow planning|Other


Please notice, that when you submit this form, we will be collecting your personal data. For more information about personal data processing, please see our Privacy Statement.


Cookies

We use cookies to optimize site functionality and to give you the best possible experience while browsing our site. If you are fine with this and accept all cookies, just click the 'Accept' button.

You can also review our privacy statement.